Free on-site jetty quotes · Paradise Point · Sovereign Islands · Hope Island · Call (07) 3543 5050
Repair price guide

Most Gold Coast timber jetty repairs cost $1,800-$18,000 in 2026

Small board and fixing repairs usually land at $1,800-$4,500. A serious re-deck, bearer repair or pile-cap job is more often $5,500-$18,000, and pile replacement can push a repair past $25,000. The fair price depends on how much structure is still sound below the pretty timber.

Measure the damaged deck plus any boards that must be lifted to reach framing.
Likely extras
Estimated repair range $6,900 - $13,400

Indicative Gold Coast 2026 repair range for an existing canal jetty. Call (07) 3543 5050 for a fixed quote after a low-tide inspection.

Real 2026 repair rates for Gold Coast canal jetties

Most homeowners first notice a soft board, a wobbly handrail or a rust stain around a bracket. The trap is assuming the visible part is the whole job. On canal estates from Paradise Point to Runaway Bay, salt air and splash-zone wetting usually damage fixings and concealed end grain before the top face of the deck looks bad.

Repair itemTypical 2026 rateWhat it includes
Call-out and low-tide inspection$220-$480Travel, visual inspection, probing suspect timber, basic written findings.
Hardwood board replacement$320-$560 per m²Remove failed boards, supply F17 hardwood, 316 stainless screws.
Joist or bearer replacement$180-$320 per linear mTemporary support, cut-out, marine timber replacement, hardware.
Pile cap or head repair$550-$1,450 eachExpose pile head, replace cap, refix bearer connections.
316 stainless hardware upgrade$45-$180 per fittingScrews, bolts, brackets, washers or cleat fixings depending on load.
Short marine handrail repair$650-$1,400 per mPosts, rail, fixings and tie-in to existing structure.
Barge access allowance$1,200-$3,800Small barge or water access where street and side access are poor.

These are defensible site rates, not fixed offers. A repair quote still needs the deck lifted in the right places and the piles checked at low tide.

The four variables that move the price most

First, how much framing is wet or rotten. Replacing loose boards is quick. Replacing the joists below them means taking up good boards as well as bad boards, temporarily supporting the deck, and reworking connections. That is why two jetties with the same visible damage can be $3,000 apart.

Second, whether piles are sound. A pile that is firm, straight and not badly wasted can often stay. A pile with marine-borer attack, movement at the mudline, or crushed timber at the head changes the job from carpentry to structural marine work. At that point we usually suggest a structural assessment before spending repair money.

Third, access. A clear side path in Mermaid Waters is very different from a Sovereign Islands site where materials need to move by water or through tight landscaping. Access changes labour hours, waste handling and whether work has to be staged around tides.

Fourth, the hardware specification. In sheltered dry framing, hot-dip galvanised hardware can be acceptable for some components. In splash zones and visible deck fixings, 316 stainless is usually the better default. It costs more on day one, but cheap fixings can stain new boards and fail before the timber does.

There are also jobs we will talk you out of. If one or two boards have lifted because screws have backed out, and the boards are still firm, a homeowner may be able to refix them with correct marine screws after checking there is no hidden rot. If the jetty is only used for occasional fishing and the handrail is sound, you may not need a cosmetic re-deck this year. Spend the money where it changes safety or life span.

Need to know whether repair is worth it?

Send photos of the deck, pile heads and waterline. We will tell you whether it looks like repair, rebuild or inspection first.

Worked example: a typical Paradise Point re-deck and bearer repair

A common job is a 7 m by 1.8 m private canal jetty with soft boards along the outer edge, two bearer ends showing rot, and old mixed fixings. The usable deck area is 12.6 m², but the repair area is priced as 15 m² because boards need to be lifted beyond the obvious damage.

Line itemCalculationTypical amount
F17 hardwood re-deck15 m² at $420 per m²$6,300
Bearer and joist repairs9 linear m at $240 per m$2,160
316 stainless hardwareAllow for screws, bolts, washers and brackets$1,250
Waste removalCut, carry and dispose of failed timber$680
Low-tide pile notesProbe accessible piles while deck is open$420
TotalBefore any approval or engineer requirement$10,810

That job is worth doing if the piles pass probing and the deck line is still true. If two or three piles also need replacement, the same owner should compare this repair against a staged full jetty rebuild. A cheap patch that hides bad piles is not a saving. It makes the next buyer, insurer or certifier ask harder questions.

Insurance work is different again. If the repair follows storm or impact damage, document the site before pulling timber off. The storm damage and insurance guide explains why photographs, tide timing and cause of failure matter. Insurers often want a clear separation between sudden damage and gradual deterioration.

Get a price

Ask for a timber jetty repair price

Send the repair details and photos, and we reply within 1 business day with the next inspection step.

We reply within 1 business day. Free, no obligation.

Timber jetty repair cost questions

What does a small timber jetty repair cost on the Gold Coast?
A small Gold Coast timber jetty repair is usually $1,800-$4,500 when it is limited to a call-out, several deck boards, stainless fixings and one short site visit. Once the work includes bearers, joists or pile caps, most canal-front repairs move into the $5,500-$18,000 range. If piles are soft below the waterline, a repair can stop making sense and a rebuild assessment is the better spend.
What is a realistic 2026 rate per square metre for re-decking?
For F17 hardwood re-decking on an existing sound frame, a realistic 2026 Gold Coast range is $320-$560 per square metre including removal of old boards, supply, stainless screws and labour. Narrow access, barge-only access, curved edges and lots of set-outs around ladders or cleats push it higher. Composite decking usually adds $120-$220 per square metre before extra framing adjustments.
When is repair cheaper than rebuild?
Repair is usually the right call when the piles are straight, probe testing shows firm timber, and less than about 30 percent of the deck framing needs replacement. In that case a $4,000-$15,000 repair can buy several more seasons. If several piles are moving or the main bearers are rotten at connections, spending $12,000 on patching can be poor value.
Do jetty repair quotes include approvals?
Like-for-like maintenance may not need the same approval pathway as a new pontoon, but structural changes in tidal water can trigger checks with City of Gold Coast, GCWA or the Queensland tidal works framework. Budget $700-$3,500 for advice, drawings or certification if the scope changes pile layout, footprint or loading. A written quote should say clearly whether approval coordination is included or excluded.
How long does a timber jetty repair take?
A board and hardware repair is often 1-2 days on site once materials are ready. A larger re-deck and bearer repair is commonly 3-7 site days, with timing affected by tide windows and weather. If an engineer or approval pathway is needed, allow 2-8 weeks before the tools start.
Call (07) 3543 5050