Free on-site jetty quotes · Paradise Point · Sovereign Islands · Hope Island · Call (03) 9003 0108
Demolition + new piles + engineered structure

Full structural jetty rebuild across the Gold Coast.

When repair isn’t enough. Demolition of old jetty, new driven pile installation (4–8 piles typical), F17 hardwood structural rebuild OR composite-cased concrete piles with composite decking. Engineered design by a coastal-marine structural engineer. Full Council Form 17 + MSQ Tidal Works + body-corporate approvals coordinated. 4–8 week project. ~$20K–$80K depending on length, pile spec and finish. 10-year structural warranty.

When full rebuild is the right call.

Indicators that say rebuild, not repair.

  • 30%+ of piles failing marine-borer probe: The pile network has reached collective end-of-life. Repairing the worst 30% leaves the next-worst 30% to fail within 3–5 years.
  • Pile diameter at waterline necked to <60% of original: Structural capacity is compromised — the pile may pass a static load test today but fail under dynamic wake or storm loading.
  • Multiple bearer-to-pile-cap connections rotted: When the load transfer point has gone on multiple piles, sister-stringer repairs stack up and become more expensive than a fresh structural rebuild.
  • Owner wants modern finish (composite deck, integrated LED, glass balustrade): Mid-rebuild is the right time to upgrade the spec. Adding modern features to an old structure is rarely cost-effective.
  • Pre-sale property staging: A premium new jetty adds documented sale value — $50K spend often returns $80K–$120K at sale on $2m+ canal properties.

Rebuild scope — what’s in the build.

  1. Demolition (1–2 days): Strip old decking, bearers, handrail, hardware. Cut old piles at mudline (or extract if barge-accessible). Dispose to approved marine waste handler. Salvage and credit any reusable hardware.
  2. Pile-drive (1–3 days): Truck-mounted or barge-mounted pile-drive rig delivers 4–8 new piles to engineered penetration depth. Verification by hammer-count or static load test. Pile-driving generates ~80–90dB noise — neighbour notification handled.
  3. Structural framing (2–4 days): Pile-caps, bearers, stringers, joist hangers. All in F17 hardwood with 316 stainless connections.
  4. Decking install (3–5 days): Deck boards in F17 hardwood OR composite (Modwood Marine, ResinDeck, NewTechWood). Hidden-fix or screw-fix systems.
  5. Handrail install (2–3 days): 316 stainless balustrade, glass infill (if specified), integrated LED.
  6. Pontoon install if specified (2–3 days): Pile-driven anchor system + pontoon delivery + gangway + cleats.
  7. Commissioning (1 day): Final structural inspection, MSQ / Council / body-corporate sign-off, handover documentation.

Engineering & approvals workflow.

  • Engineering design: Coastal-marine structural engineer (Bligh Tanner, Cardno, or Hardy McKew typical Gold Coast specialists) produces drawings + load case + pile-penetration spec. Required for any new pile install. ~$3K–$8K engineering fee included in the rebuild quote.
  • Form 17 lodgement: Private building certifier (we use 4 Gold Coast certifiers depending on project type). Self-assessable for like-for-like footprint. Full MCU for footprint extension. 2–6 weeks.
  • MSQ Tidal Works approval: Required for any new pile installation or footprint change. 4–8 weeks lodgement to decision. Application fee ~$320 + our preparation cost included in rebuild quote.
  • Body-corporate approval (SCCMA, Hope Harbour): 3–6 weeks. Architectural drawings + materials schedule + photo submission.
  • Insurance / utility coordination: Property insurer notification (some policies require), neighbour notification (pile-driving), works-zone marker buoys if floating barge plant.

Pile choice — service-life vs cost.

  • H6 marine-grade CCA-treated hardwood: Standard Gold Coast pile spec. 25–40 year service life. ~$650–$1,200 per pile material + drive cost.
  • Creosote-treated turpentine: Premium hardwood option. 40–60+ year service life. ~$900–$1,500 per pile.
  • Concrete-cased composite pile: Steel core, concrete jacket, composite outer wrap. Marine-borer-immune. 50–100+ year design life. ~$1,500–$2,400 per pile.
  • Full reinforced-concrete pile: Cast in-place or precast. Premium new construction. 100+ year design life. ~$2,500–$4,000 per pile.

Free full-jetty-rebuild consultation.

Engineered design. Pile spec to match your hold-horizon and budget. All approvals lodged. 10-year structural warranty.

Call (03) 9003 0108